%{tishi_zhanwei}%

Construction of anticorrosive paint for highway bridge reconstruction of Jiujiang Yangtze River Bridge

Since the Jiujiang Yangtze River Bridge was opened to traffic in 1993, it has been subjected to a load and traffic that exceeds its design load level for a long time, which has caused serious damage to the highway bridge deck, repeated damage to expansion joints, and a large number of cracks in the steel beam. Traffic safety of the main railway bridge. With the consent of the National Development and Reform Commission, the Ministry of Transport, and the three provincial governments of Jiangxi, Hubei, and Anhui, the Jiujiang Second Bridge will be comprehensively reformed after it is opened to traffic.

Our company contracted the construction work of the anticorrosive coating in this repair.

Category: