%{tishi_zhanwei}%

Search Case Results

1.5 million tons / year ethylene project of Hengli Petrochemical (Dalian) Chemical Co., Ltd.

Hengli Petrochemical (Dalian) Chemical Co., Ltd.'s 1.5-million-ton / year ethylene project includes a 1.5-million-ton steam cracking ethylene plant and a total of 13 downstream chemical plants (including four sets of reserved units such as polystyrene, SBS, and SSBR) and supplement Fuel gas conversion device for increasing fuel gas shortage in refining and chemical installations); public engineering systems include raw materials, intermediate products, product tanks, air separation, air pressure, circulating water fields, power supply systems, and some fire protection systems; supporting facilities include Desalination project, sewage pretreatment, torch system, chemical warehouse, etc.

Read More

Heilongjiang Longyou Petrochemical Co., Ltd. 5.5 million tons / year heavy oil catalytic thermal cracking project and 950,000 tons / year polyolefin project procurement of anticorrosive and fireproof coating framework

Daqing Lianyi Petrochemical Co., Ltd. is committed to developing into the top domestic and global leading petrochemical industry brand. On May 24, 2018, its wholly-owned subsidiary Heilongjiang Longyou Petrochemical Co., Ltd. started construction of 5.5 million tons of heavy oil per year. Catalytic cracking project and 950,000 tons / year polyolefin project. The total investment of the project is about 11.6 billion yuan, with a total area of 1.886 million square meters.

Read More

New construction of fire protection coatings for steel structure of Bijie Station in Leshan to Guiyang section of Chengdu-Guiyang Railway

Bijie Station is located next to Biyang Avenue (G326 National Road), Lishu Town, Jinhai Lake New District, Bijie City, about 20 kilometers from Qixingguan District. It is the largest of more than 10 stations (excluding Chengdu and Guiyang) along the Chengdu-Guizhou high-speed railway. station. The platform canopy covers an area of 16,200 square meters, the projected area of the passenger flyover bridge is 2,098.42 square meters, and the area of the passenger tunnel is 2,916.07 square meters. It can accommodate up to 1500 people at the same time, and the number of passengers sent during peak hours is 796. Our company contracted the fire protection construction of the steel structure of the project, which has a total area of about 30,000 square meters.

Read More
< 1...345...84 > proceed page